TrailsEdge Finish Schedule

Visit the Trailsedge website

Room Wall Floor Other

Great Room Linen Paint; Preengineered or wood flooring; Exposed beams in ceiling

Kitchen/Dining Linen Paint; Hardwood Maple cabinets (alt – Hardwood Cherry)

Laundry Room Linen Paint; Ceramic Tile

Bedrooms Linen Paint; Carpet

Bathrooms Linen Paint; Ceramic Tile Flooring

Hallways Linen Paint; Carpet Upstairs; First Floor preengineered or wood flooring

Entry Linen Paint; Ceramic or Cut Stone

Vermont Room Linen Paint; Cut Stone or Ceramic Floor

Basement Unfinished Cement slab plumbing stubbed out

Plumbing Fixtures

Water closets: Kohler, American Standard (or equivalent), Elongated Bowl, Low Flow in white

Main Floor Bath: Fiberglass shower tub

Master Bath: Tiled shower stall and 72”x36” jetted tub, Vanity quality to match kitchen cabinets

Guest Baths: Fiberglass shower stall, Vanity quality to match kitchen cabinets

Countertops

Kitchen and Master Bath: Granite with undermount sinks

Guest Bathrooms: Cultured stone

Kitchen Cabinets

Armstrong Maple or Cherry Hardwood, basic hardware

Appliances

(Color of all standard appliances: stainless) 21 Cu Ft Frost Free Refrigerator, Dishwasher, Ceramic Top Oven, Microwave, & Disposal.

Closets will be furnished with wood hanging rod or vinyl coated wire.

Pantry & Linen closets furnished with shelves – vinyl coated wire.

Washer and Dryer in Laundry

*subject to change – subject to availability, substitutes of equal or better quality may be made without prior notice